
NVIDIA GB300 Grace Blackwell Ultra Desktop Superchip and 748GB of large
$101,046.99 partner price

Live distributor cost, written quotes
GPUs, servers, storage, networking and the power and cabling around them, sourced from the authorized US distribution. You see a real price and an honest availability line; the quote confirms both.
Concept render — illustrative scene, not a photograph of our inventory or facilities. Product cards use product-class renders where no staged photo exists.
Shop by category
Every category is backed by real distributor rows with pricing and availability confirmed on the quote.

→Power & RackCooling & Thermal, PDUs & Power Distribution, Power Supplies
→Endpoints & PeripheralsComponents & Upgrades, Desktops & Workstations, Docking & Accessories


Priced picks
Representative configurations with live partner prices. Availability is confirmed in writing on the quote.

$101,046.99 partner price

$95,831.99 partner price

$229,097.99 partner price

$209,443.99 partner price

$246,036.99 partner price

$242,382.99 partner price

$248,827.99 partner price

$247,850.99 partner price
How buying works
Use the catalog, a bill of materials, or the quote cart.
Part numbers, availability, freight and lead time confirmed in writing.
ERP-backed order with branded PO and invoice; serials recorded.
Stock from US distribution or drop-ship with tracking.
How ordering works
Use the catalog, a bill of materials, or the quote cart — a single adapter and an eight-GPU rack go through the same desk.
We check authorized-distributor stock and cost, and state the as-of time. Build-to-order lines get a dated lead time, not a promise.
Line items, partner price, freight, lead time, terms and validity — issued from the live system, confirmed in writing.
ERP-backed order with branded PO and invoice in the same system; serials recorded; stock or drop-ship with tracking.
Part number, description, quantity, partner unit price, extended price, freight basis, lead time, payment terms and quote validity — all on one issued document.
Request a quote →Cabinet, PDUs, switching, servers, GPUs, storage and cabling quoted as one bill of materials, with staging if you want it.
Build a rack →Distributor stock is shown as measured, with the as-of time. Where stock does not exist we say so and give the expected lead time.
Live offers →Authorized US distribution with freight quoted per destination — stock ships from distributor warehouses, build-to-order from staging.
Services →Written quote inside 48 hours for catalog and BOM requests; availability and lead time re-confirmed on every quote.
Pricing & terms →Digit-free document previews, gated order status and a single audit trail from quote to invoice.
Trust centre →How it works
Proof
Real captures from the running storefront and partner portal. No mockups, no fabricated customer logos, testimonials or metrics.






FAQ
It is the current partner price from live distributor cost. The written quote is the committed number; if the distributor cost moves between quote and order, we tell you before anything ships.
Both. A single adapter and an eight-GPU rack go through the same written quote.
Yes — cabinet, power, cooling, cabling, servers and GPUs can be quoted as one bill of materials, with staging if you want it.
Businesses, public sector and education buyers who need hardware sourced properly and documented. We do not run a consumer storefront.
We say so on the quote and give the expected lead time, or propose a comparable part and name the difference.
They are published under Policies: shipping and freight, returns and RMA with restocking terms, warranty pass-through, security and compliance, privacy and export control. Support covers quote, order, payment and RMA help.
Verified distributor stock
Live distributor availability, refreshed continuously. A line appears here only while its stock check is less than an hour old; everything else is quoted with availability confirmed in writing. Distributor stock is not our own on-hand.
Checking live distributor stock…